Saturday, July 7, 2012

Project Politics: Good Thing. Bad Name.


          Politics has a bad name – so bad even politicians sneer at it. Pretty much every other day, some leader of a national party dismisses the opposing position in the healthcare debate as “politics.”  Bad stuff, he/she is saying. Dishonest and exploitive.
          It’s almost astounding to realize that politics once was considered a noble calling. Nowadays, the polls rate this – dare we call it a “profession?” – incredibly low in public esteem. Somewhere in that six-mile-deep Marianas Trench in the Pacific Ocean. Lower than whale droppings. It gets no respect. None.
          So you’re up against it when you remind everyone that politics is an essential function of civilization, to say nothing of democracy. It is equally at the core of project management. It is the art and science of accomplishing a mutually-valued outcome among disparate parties.
          The unsatisfactory alternatives are dictatorship, war or surrender to unsolved problems.

          Project managers actually have a much more favorable reputation than politicians – or should that be “a much-less-unfavorable” reputation? (Did you hear the one about the cannibals who lived happily within a large organization until they were exposed? One of them carelessly ate a janitor instead of the customary project manager. The janitor was missed instantly.)
          In fact, politics, like project management, can be practiced very well or very poorly. Or somewhere in the vast range of quality between the extremes.
          Similarly, the issues of either profession can be vitally important. Healthcare, so obscured by irrelevant and inane argument, really matters. People are dying because they can’t afford care, and people are going broke trying to pay for it. The country can’t continue to afford the way we’re going
This has been on the national agenda, in one form or another, since at least the days of President Theodore Roosevelt. We should all get our heads together and do something about it. You don’t have to take one position or another to think that would be an important thing to do.

It’s a project. A project within the humongous, revolutionary project that is the United States of America. And don’t believe there isn’t plenty of risk in them both, particularly the survival of the way of life we enjoy in this country.
At the end of the Constitutional Convention in 1787, Benjamin Franklin referred to the newly-formed entity as “a republic, if you can keep it.” He was not at all alone among the founding members in understanding this thing needed careful tending. Thomas Jefferson famously said, “Eternal vigilance is the price of liberty.”
It would have been too clumsy for Franklin to have said, “It’s a project, if you can manage it.” Or Jefferson to have warned, “Constant risk management is the price of democracy.”
The entire enterprise, at the time of that years-long “project charter” negotiation, was politics of the highest order. Washington despaired of getting the battling factions to agree on anything – but he kept it together through determination, persuasion and leadership. He was the ultimate political project manager, and without him the whole thing would have come apart.

In our infinitely smaller way, we project managers need a sufficiency of the same characteristics to do our job. It’s not all Gantt charts and work package specifications, however necessary they are.
You don’t have to call it politics if that offends you, but you’d better practice it that way if you’re going to hold your stakeholders together and navigate the political challenges of your projects.

Tuesday, May 29, 2012

Confidence


          Confidence is optional.
          You’re confident when you are absolutely sure that what you’re doing will work. That’s true of all of us. When we’ve worked out all the kinks and gotten the routine down, we have no doubt that whatever it is will come out exactly as we intended.
          The trick is to have that conviction when none of those factors are present. How can I be sure I’m going to succeed when there are all kinds of problems I don’t know how to solve, when I’ve never done this before – or worse, when I’ve tried it a couple of times and failed?
          Just to add to the description: What if everyone tells me it won’t work, can’t work, will never work?

          What kind of fool just sails ahead, serene in the certainty of success, when everything points to failure? We’ve seen people do that, and suffer painfully public pratfalls.
          Maybe, once in a great while, we’ve seen such carefree people succeed without suffering any apparent pain. Not often, and we might have suspected that they were just as surprised as anyone. Was that confident competence . . . or just dumb luck?
            More directly important to us project managers are those who sweat and claw and fight, staggering and persisting their way to success, no matter what. These are people who get knocked back and knocked down, and just keep coming.
          Is this noble commitment or foolish stubbornness? Who cares? It works.

          People who do this can pay a heavy price, in the exhaustion of their personal stock of emotion, mental balance and even physical strength and endurance. They may not sleep well, eat properly or exercise enough. Their health can suffer significantly. This is not really a good way of life.
          Equally important can be the toll on their relationships, personal and professional.
When you work long hours and focus your attention on overcoming difficult workplace challenges, you don’t have a lot of time for the wife or husband and kids. Or much else for yourself as a person. Where does this go?
Similarly, when you’re stressed and overworked on the job, you simply can’t devote the proper time and attention to listening, explaining and collaborating. Things go downhill.
You can make it in such demanding circumstances, but you tend to become more driven than confident. There’s a difference, and it’s a very obvious one. Not good.

True confidence, on the other hand, is made up of competence in performance combined with contentment in attitude. I believe it is a state that can be consciously sought and gradually built – both the external skills/practices and the internal attitudes/feelings.
          Amazing discoveries can result from the candid and thoughtful consideration of one’s own habits and assumptions. You might find that the barriers are only in your mind, and the possibilities are breathtakingly at hand.
          You thought you just couldn’t deal with conflict. You might discover that you can focus on mutual rewards without distraction from  overblown and uncontrolled emotion. Not only can you arrive at an adult agreement, but you can win the admiration of combatants and onlookers. It depends upon movements of the mind that are fully within your control.

          And you can be persistent in follow-through where you never have been before. You slow it down. You apply your mind, judgment and experience instead of allowing your feelings and unthinking reactions to divert you.
You focus your thinking on the logical steps along the way, making it specific and do-able in your mind, instead of thinking about all the reasons why it’s a pain and/or all the things you’d rather be doing instead.
You can purposefully design and implement a program of logic to command your behavior in situations of demand and stress. You can train patience into your previously impulsive behavior.
You can install a little red light in your mind to warn you when anxiety or fear is rising, so you can immediately kick in your personal problem-management process. It works.       

          So confidence indeed is optional. It takes some work. But the payoff can be lifelong, and incredibly worthwhile.

         
          

Friday, May 11, 2012

The Precious Resource

      Management 101 defines the manager’s job with stark simplicity: to get the highest possible value in the shortest possible time at the lowest possible cost . . . for the longest possible period of time.
Nothing to it. Just get out your calculator and organize an efficient investment of resources, then implement, monitor, adjust.
If it were that simple, of course, there would be no need for expensive managers. Just resources, planners and monitors. Here’s how it would work:
At its simplest, the list of resources is a short one:

                  TIME

                  MONEY

                  PEOPLE

                  EVERYTHING ELSE (Facilities, materials, etc.)

Time is the most rigid of the resources.
Everybody has the same amount of it. It just ticks away, one second at a time, sixty seconds per minute, sixty minutes per hour.
Einstein theorized that time becomes flexible as one nears the speed of light, but since few of us work at that rate, Einsteinian time is not an issue.
In reality, time is a great tool for measuring the investment of the other resources against results, and that’s it. It is a tool for making value decisions, but otherwise contributes nothing. A deadline’s value is in what a person or group can accomplish by a given moment. The people action is what’s important.

Money is the universal resource.
Everything can be converted into a cost. If you have enough money, you can buy whatever you can absorb of any other resource.
The People resource, for example, can be calculated in terms of “fully loaded labor cost.” That means a person’s salary and fringes plus the person’s proportionate share of cost of the organization’s common amenities: the building, insurance, air conditioning, marketing, etc.
If everyone in a company were of exactly the same value to the organization, you could divide its total cost of operation for a week by the number of employes. That would tell you how much each employe was costing the company, and therefore how much value that worker should provide for the company to break even on employing that person.
Things aren’t that simple in the workplace, but you get the idea. Money makes everything else possible, but has no intrinsic value of its own.

Let’s skip to Everything Else.
Here you can have construction materials, computer databases, office furniture, whatever. None of it does anything but sit there (costing money and probably deteriorating) without the wise use of it by human beings.
Information can be vitally important, in a Project or other activity, but only if it is known, understood and properly employed by people.
The “everything else” category is the one that, in general, can be replaced or substituted for by other resources. For example, if you have enough time you can swing an old-fashioned hammer instead of using an air-operated nailer. If you have enough money you can buy more raw materials.

The People resource is the central and most meaningful of the resources. Without it, the other resources have no meaning. They don’t do anything.
Under weak management, the people involved in getting things done are seen as the “adapter” in the scheme of things When you run out of time, make people donate time by working extra hours. Withhold overtime, and you save money, too.
If the Project suddenly hits an unexpected problem or picks up some added requirements, you can’t afford to bust the budget or miss the deadline – so you push the people harder.
In a properly planned Project or other activity, the human resource is not an adapter. The people who staff the Project have been carefully “estimated” to fit the requirements by devoting reasonable time to the effort. The result has been defined, and all the resources – including the human one – have been organized to get it done. Again in simple terms, the overall “investment” can be represented in a formula:

      Time + $$$ + Everything Else x Human Effort = Outcome

                                          T + $ + E x H = O

Time is added, along with Money and Everything Else. The role of Human Effort is that of a catalytic multiplier employing the other resources to achieve the planned Outcome.
If something happens, say the deadline is suddenly moved up to hit a window of opportunity in the marketplace, something has been subtracted from the T.
Logic – or good management – says O will be proportionately reduced, unless a sufficient increase is made in one of the other elements on the lefthand side of the equation.
Instead, what frequently happens is a greater burden is placed on the less-measurable human resource. Can’t you hear it now? “Let’s just take a few of these people sitting around drinking coffee and get another few minutes of work a day out of each of them.” Bingo! Problem solved.
You do that a few times – and it can work over the short term if the people care about the organization and believe in the Project – and you wear the human resource down. Its productivity declines. People get tired and uninspired. You miss the deadline (time), run over budget (money) and still have a poorer result (Outcome).

 So the substitution of human effort for other resources is of very limited value, and in fact usually is negative.
And, of course, if the enthusiasm was not there to begin with, there was not even a short-term gain.
However, the biggest price paid for such mismanagement is the effect it has on the people. They learn to distrust managers and their plans. They learn to protect themselves. They play the game as survivors, placing no value on courage, commitment or extra effort. You won’t get them back.
In short, you have blown the most precious resource. 

Sunday, April 29, 2012

Email: Blessing and Curse



          Email is one of the most burdensome marvels we’ve ever had in the workplace.
          It’s hard to remember what business communication was like before email swept our world 10 or 15 years ago. It’s so easy now, and because it’s so easy it has choked the channels.
          The downside comes because “easy” does not mean “better.” In fact it almost always means “worse.” Easy means less demanding for the originator . . . and a transfer of demand to the receiver. Not a good idea, when the whole transaction was not the receiver’s idea to start with.
          Studies of email volume relegate a large portion to the category of useless, another sizable bunch to the seductive group of interesting but also useless, the lesser number that you’ll save for later today and the small minority that call for immediate action.

          Think about investing a modest amount of attention in managing this.
          Stand back for a moment from your daily flood of email messages. It’s a glut. Look at all those things. How do they contribute to the productivity of your day? Do you have something of a choking feeling when you open your inbox and feel obligated to sort through?
          Don’t.
          Don’t have the feeling, and don’t sort through. You’re better off being something between the grim reaper and the thoughtful scholar.
You act on autopilot because you’ve got a process based on a plan. You deal with email as a tool of your profession, and you don’t confuse idle curiosity with professional time investment.
The first priority is hot items. What needs action . . . now? Do it.

Now you shift to proactive mode. You become the party of the first part. You send the email messages you need to send, initiating various matters of concern. Then you move away from email, on to your next job priority.
Sometime around the middle of your workday, you visit your email again. You repeat the morning’s routine.
Then, as there’s a bit less urgency now, you do some brushcutting. You ride the delete key, killing every item whose author, subject line or first lines show no sign of value. If the writer made no effort to engage your attention, the message deserves the same on your part.
It’s useful to remind yourself that email is so easy to write and send that it too frequently is sloppy, a vehicle of low-value communication. If the sender really meant it, you’ll hear from that person again.

The flip side of this issue is what it tells you about how to behave as an email originator.
When thoughtful people pop online with a few minutes to check in between other demands of the job, what do they look for? It’s not the subject line (although effective emailers learn to tune those precious few words carefully).
No, more than that, you look for the sender. There are people in your worklife who matter to you, a lot. Their names pop out at you from the inbox when their messages are in there. For whatever reason, their messages are automatically top priority in your work.
Why?
The most important senders, normally, are those who never email you unless there’s a reason that both of you consider important. You want to be that high-priority person, in the inboxes of all the people with whom you have email relationships.

So you never send trivial emails. You don’t use email when another communication method is more appropriate. You never include a recipient who does not have a direct, immediate, valuable reason to get this information from you now, in this way. Your email partners know that, and respond accordingly.
          You can do things with this workplace communication vehicle that are amazingly useful. You also can be astonishingly self-destructive. Achieving the one and not the other requires just a little professional thought.
          Take your pick.

Wednesday, April 18, 2012

Them

          They.
I know who “they” are. So do you. We all do. They did this. They won't let us do that.
          They are “them.” The overpowering, unresponsive blank wall utterly insensitive to our struggle to function, to get redress, to express ourselves. They do brutal things without a second thought, and have no interest at all in recognizing our worth . . . or even our humanity.
But have you ever had the uncomfortable sensation of discovering that YOU are “they?” No one ever calls you that to your face, but sometimes you find out from a third party that some person or persons referred to you that way. Maybe you hear that there were nods of approval among people you thought believed in you.
Something you did or said was seen as the brainless/heartless kind of thing that the system/bureaucracy/dictatorship routinely does. Not a good thing.
Hey, I’m not “they.” These folks know me. They know I’m not like that. It’s a shock to discover that they don’t.

          Being one of “they/them” is part of the job definition for managers. For project managers, it frequently has the additional burden of the conviction on the part of your “team members” that you are ignorant or unskilled in their areas of specialty.
          Why should they take you seriously? What of value could they possibly look for that you could provide? What could convince them that they need you? They’ve seen a lot of people like you, and those people have been more of an obstacle, an annoyance, a butt of jokes – than a person to look up to for guidance, support and leadership.
          In years of talking with people and working with people in project management, I have run into this fundamental stopper all too often.

          Interestingly, both sides, in effect, agree. The working end of the spectrum uses the concept and – routinely – the term “they.” The other end, more often than not, tends to act out the attitude. The senior partners focus their concern on outcomes rather than the real human beings who bring the outcomes about.
          The bosses too often have their own “they.” That “they” is the faceless mass of opposing working staff people who don’t understand the important needs of the organization, cannot be trusted to do their work faithfully and are basically incompetent – often laughably so. 
          And don’t you believe that both “theys” don’t know how they are caricatured by the other side. They know very well. For sure, it doesn’t make for vigorous teamwork in the workplace.

          So here you are, a project manager. Instantly, upon your designation to lead this challenging effort, you are draped in the mantle. You are “they.”
          What do you do?
          You manage. The true believers of the cliché have rarely seen a real manager in the astounding process of good management. They have been conditioned to see overstressed, underempowered bureaucrats desperately flailing to survive.
          Show ‘em. Manage. Do your homework. Get the information. Create the fundamentals, Build the relationships. Challenge power to do its share. Identify the problems. Emplace the solutions. Most of all, build the relationships.
          Invite people into an exciting adventure in which their investment of commitment will be rewarded with honor and attention. Open opportunity for their knowledge and hard work to produce meaningful results.
          Do your job.
          Then, in a remarkably satisfying way, there is no “they.”
          No more “theys.” Just “US.” 
  

         

Saturday, April 7, 2012

It's the Politics, Stupid

          All the best project managers I have known are superb politicians.

          Politicians? Politics? Yuck! We hate politics!
          No, we don’t. We don’t hate politics. We hate sleazy politics, and because of that we avoid politics, and because of that we’ll never be very good at project management.
We don’t understand that ALL human relationships are run by politics, and the best relationships are managed by topflight politicians.
Great marriages, for instance, succeed so well because the couple has mastered, not only continuing true love, but the negotiated matters of effective partnership in managing children, solving finances and taking out the garbage.
          Marriage is a project, the most profoundly important project most of us ever get to star in. It has all the elements – complexity, dependencies, uncertainty, risk, diverse participants, resource management, disruptive variances and limitations on individual freedom of action. Etc.
          The people who find themselves in these grand experiments never understand all that until they’re committed, responsible . . . and stuck. Not in a bad way, you understand, but very openly stuck.

          Our current public politics, narrowly defined, are at first look an example of disgracefully bad project management. The major matters at the national and state levels are neglected, distorted or subverted in favor of what appear to be narrow and destructive ends.
          This public politics business actually is a side issue in the context of our discussion, but two quick observations could be useful.
One is that some mayors and other local leaders are doing yeoman work in finding ways to do the best possible in their grim realities while the more-insulated big players hurl their thunder, mess with vital resources and screw the end user. The hometown heroes are managing their projects, not bewailing their situations.
The other point for thought is that the bitter collisions in the public arenas of Washington and state capitals actually are political projects in process. Like sausage in mid-manufacture, the making of public-policy outcomes is nothing for the faint of heart to witness close up.
Each of the parties in contention has its eye on a goal, and has chosen a set of actions to achieve that goal. Elections are the close of project phases, as are the terms of administrations, but the final outcome of those collected projects won’t be achieved (or known) in our lifetimes.
In short, what goes on in politics as customarily defined does indeed illuminate aspects of our projects, but does not define our management of them.

The truth is that project management requires its practitioners to practice politics to succeed. Gather your information, organize your people, plan your process, prepare for your unpleasant surprises, convince your stakeholders, persuade your end users and go for it.
Project management. It’s the politics. OK, you’re not stupid. You knew that.

Thursday, March 29, 2012

Project Management, the Attitude

          What is “project management?” What is a “project manager?”
          Well, project management is managing projects, and project managers are the people who do it, right? What’s so complicated about that?
          Everything, that’s what.
          Start with “project.” Research reveals that many activities called by that name are not projects – they are repeatable, repeated processes that reward adherence to standardized actions. They are processes. The more rigidly you, the manager, enforce predetermined details, the better the result. You’re after maximum predictability and minimum variance.

          That’s not project management.
          Well, wait a minute. Many project management functions are processes. Within every project there are requirements, often covering substantial parts of the effort, that are true processes. They are precise, predetermined sequences of actions to reach known outcomes.
          That formula is comforting to many people, and  they simplify their lives by making project management itself into a process, which it isn’t. This is why there are so many arcane formulations in the field that keep people busy while utterly missing the real project management issues.

          An organized activity is a true project only when there also are complex parts you’ve never done before, some human and some procedural. Even the known sections can be severely impacted by the risks and uncertainties that accompany them.
          One of the failings that bedevil projects is a tendency to focus on the known parts to avoid the anxiety of dealing with the unknown ones. That slows, hampers, damages projects. Kills or substantially cuts back on many.
          So project management is controlling the multiple, continuously shifting pieces of a varied, undependable enterprise. It involves estimating and inventing, tracking and adjusting. It supremely demands the ability to delegate responsibility, inspire confidence and maintain compliance – in the midst of circumstances that can be very uncomfortable.
          Who wants to live that way? Volunteer project gladiators aren’t plentiful in most organizations.

          Those who lead this kind of work, and especially those who do it well, are even more rare.
          You’ve seen a few of them in your life. These are people who can thrive in the bramble patch, handling simultaneous bad moments with decisiveness, tolerance and imagination. They demonstrate unusual skill at planning ahead and anticipating problems, and yet are flexible and persistent when their careful preparations come apart.
          They devote themselves to the tedious gruntwork that underpins all good strategic and tactical planning. They find ways to get the organization to stick by them. They make middling people good and good people better. They take responsibility and solve problems. They themselves are never the problem.

Most of us can’t think that way, nor act that way. But we could. It’s what the good ones do. It doesn’t require unusual talent. It takes determination and it takes a bit of courage and a lot of persistence.
It short, all it takes is an attitude.